Construction Wild Air & Dehumidification Specialists

Wild Air in UAE | Temporary Construction HVAC & Chilled Water Dehumidification

Conditioned Air & Humidity Control for High-Rise Interior Fitouts & Finishes

Turnkey Wild Air cooling and dehumidification for construction projects across Dubai and Abu Dhabi. Protect joinery, dry gypsum, and maintain consultant inspection compliance.

Turnkey Chillers
Pumps, Hoses & Tanks
Itemized Quotes
Zero Hidden Surcharges
HVAC Engineers
24/7 On-Site Mechanics
Rapid Dispatch
60–120 Min UAE SLA
Wild Air in UAE | Temporary Construction HVAC & Chilled Water Dehumidification
Verified UAE Fleet AHRI / Eurovent Certified
Factory Chiller Partners: Trane (USA) Carrier (USA) York by Johnson Controls Daikin Applied (Japan) SKM Air Conditioning (UAE) Dunham-Bush
Equipment Categories

Commercial & Industrial Rental Cooling Fleet

Select your tonnage class for immediate mobilization across Dubai, Abu Dhabi, Sharjah, and all Northern Emirates.

50 – 150 TR 175 – 525 kW

Portable Scroll Chillers

Compact air-cooled units with dual hermetic scroll compressors and R-410A. Ideal for server rooms, clinics, and small events.

Noise: 65–68 dBA @ 10m • Flow: 25–55 m³/hr
200 – 400 TR 700 – 1,400 kW

Heavy-Duty Screw Chillers

Semi-hermetic screw chillers with R-134a, stepless slide valve capacity control, and Blygold anti-corrosion condenser coils.

Noise: 68–72 dBA @ 10m • Flow: 80–135 m³/hr
500 – 1000 TR 1,750 – 3,500 kW

High-Capacity Modular Chillers

Multi-compressor modular screw chillers engineered for district cooling augmentation, concrete batching, and petrochemical plants.

Noise: 72–74 dBA @ 10m • Flow: 160–270 m³/hr
1200 – 2500+ TR Multi-MW

Synchronized Central Plants

Synchronized modular chiller plants with automated hydronic header balancing, secondary pump skids, and redundant standby capacity.

Redundancy: N+1 Continuous • Uptime: 99.98% SLA
500 – 4000 GPM VFD Booster Skids

Secondary Pump Packages

Skid-mounted duty/standby variable frequency drive (VFD) centrifugal booster pumps with integrated expansion tanks and bypass valves.

Head: Up to 350 m³/hr • Pressure: 16 Bar PN16
5,000 – 35,000 CFM Air Handlers

High-Static AHUs & Wild Air

Heavy-duty air handling units with high external static pressure, flexible fabric ducting, and G4/F7 filtration for site air conditioning.

Static: Up to 600 Pa • Ducting: 12" to 24" Spiral

Service Scope & Technical Engineering Specifications

Turnkey Wild Air Cooling & Dehumidification Across UAE Construction Sites

In modern United Arab Emirates construction and architectural engineering, "Wild Air" refers to the temporary introduction of conditioned, cooled, and dehumidified air into a building prior to the permanent HVAC system being energized or handed over by DEWA, ADDC, or district cooling providers (Empower, Tabreed, Emicool). Without Wild Air, internal building temperatures quickly exceed 45°C with relative humidity spiking above 85%, causing catastrophic structural and interior finish failures.

Rental Power UAE is the industry-leading provider of turnkey Wild Air solutions across Dubai, Abu Dhabi, Sharjah, and Ras Al Khaimah. We deploy specialized temporary air-cooled chillers, high-static air handling units (AHUs), and heavy-duty desiccant dehumidifiers that inject cool, dry air across building floors, ensuring architectural joinery, gypsum ceilings, specialized wall coatings, and marble flooring cure precisely to manufacturer specifications.

Why Wild Air is Critical for UAE Interior Fitouts

1. Gypsum Board & Plaster Curing

Excessive humidity and unconditioned heat prevent gypsum compounds and joint adhesives from drying uniformly, leading to seam blistering, surface cracking, and immediate consultant rejection during handover inspections.

2. Architectural Joinery & Wood Parquet

Natural timber doors, kitchen millwork, and hardwood flooring absorb airborne moisture, swelling in humid air. When permanent AC is later turned on, the wood shrinks abruptly, causing permanent warping and gaps.

3. Specialist Paint & Epoxy Coatings

Epoxy resin floors and decorative interior coatings require substrate temperatures below 30°C and relative humidity below 65% to achieve full cross-linking tensile strength and avoid cloudy moisture trapping.

4. Worker Health & Productivity Standards

Comply with UAE Ministry of Human Resources and Emiratisation (MOHRE) summer midday safety regulations by keeping indoor ambient wet-bulb temperatures within safe ergonomic working thresholds.

Our Turnkey Wild Air Engineering Approaches

Method A: Temporary Chiller + Building Riser Tie-In

When the building's internal chilled water piping and permanent Fan Coil Units (FCUs) or Air Handling Units (AHUs) are already installed, but district cooling or permanent central chillers are awaiting utility connection, we connect a temporary rental chiller directly to the building's main header. This energizes the building’s own internal cooling distribution system seamlessly.

Method B: External Skid Chillers + Temporary High-Static AHUs

If internal ducting is unfinished, we position high-static rental AHUs (10,000 to 35,000 CFM) on building terraces or ground level, connected via flexible rubber hoses to our skid chillers. Conditioned cold air is pumped through heavy-duty vertical fabric risers or stairwell ducts to pressurize individual floors.

Method C: Standalone Packaged DX AC Units

For low-rise commercial developments, luxury residential villas, or retail mall tenancies, skid-mounted 20 to 50-Ton packaged AC units provide plug-and-play Wild Air delivery without requiring water pipes or hydrostatic testing.

Protect Your Fitout Deadlines — Hire Wild Air Today

Consult our Wild Air engineering team to calculate required air changes, dehumidification rates, and chiller tonnage for your construction site.

Frequently Asked Questions — Wild Air in UAE

What target temperature and relative humidity does Wild Air maintain? ▼
Standard UAE architectural fit-out specifications require indoor air conditions maintained between 22°C and 25°C dry bulb, with relative humidity held strictly between 50% and 60% RH. Our Wild Air packages maintain these exact psychrometric parameters continuously, logging temperature and humidity data for consultant verification.
Who provides fuel and generator power if permanent site power is not connected? ▼
Rental Power UAE provides a complete self-contained turnkey service. We supply the temporary chiller, circulating pumps, silenced Cummins diesel generators, external bulk diesel storage tanks, and automated 24/7 diesel refueling so your main site power team does not need to worry about fuel management.
How many air changes per hour (ACH) are required for effective Wild Air? ▼
Depending on building envelope tightness and ongoing construction dust levels, our engineers typically design for 2 to 4 total air changes per hour (ACH) with positive building pressurization to keep hot ambient humidity and blowing desert dust from infiltrating through elevator shafts and perimeter door openings.
Engineered Standards

Technical Features & Equipment Specifications

High-capacity temporary air handling units (AHUs) up to 35,000 CFM paired with modular chillers
Deep moisture extraction and continuous fresh air supply to maintain building interior dewpoint
Protects moisture-sensitive architectural finishes: acoustic ceilings, solid parquet, wallpaper, and joinery
Temporary duct risers and floor-by-floor distribution manifolds for multi-story towers
Continuous 24/7 humidity and temperature monitoring with calibrated digital data loggers
Zero contamination of permanent HVAC ductwork, coils, and air filters prior to client handover
Commercial Advantages

Why UAE Contractors Trust Our Fleet

Prevents catastrophic warp, mold growth, and drywall cracking during the hot, humid UAE summer
Accelerates paint, gypsum plaster, and floor adhesive curing times, shortening critical path project schedules
Enables testing and commissioning of sensitive electronic building management systems in clean, cool air
Complies with LEED and Estidama indoor air quality requirements during the construction phase
How It Works

Our 4-Step Turnkey Rental Process

1

Load Sizing & Feasibility Audit

Our electrical engineers calculate your starting and running inrush currents to recommend the exact kVA rating without over-sizing.

2

Rapid Dispatch & Logistics

Our fleet of crane hiab trucks transports the generator, external fuel tanks, and cabling to any site in Dubai, Abu Dhabi, or Sharjah within 60–120 minutes.

3

Cabling & Commissioning

Certified technicians terminate flexible copper power cables, test earth rod grounding (<5 ohms), connect ATS panels, and verify voltage balance.

4

24/7 Monitoring & Fuel Delivery

We handle continuous 250-hour oil/filter servicing, fuel telemetry refills, and provide 24/7 on-site mechanical emergency support.

UAE-Wide Fleet Coverage

Depot Hubs & 2-Hour Dispatch Across All 7 Emirates

With operational yards located in Al Quoz, JAFZA, Musaffah, and Sharjah Industrial, we guarantee rapid equipment dispatch and emergency technician response to all UAE zones:

Cross-Discipline Solutions

Specialized Equipment & Engineering Services

Explore our comprehensive power generation, commercial cooling, and modular infrastructure divisions across the UAE.

Equipment Fleet

Available Fleet Models for Immediate Mobilization